Industrialization · The invention engine Planned
From industrial problem to chemical asset.
Discovery programs are designed to run steps 01–05 on a partner’s problem. Avestiq-owned candidates are intended to continue through steps 06–08. Results are designed to return to the system.
The objective is not a predicted molecule.
It is a deployable chemical technology.
FTO: freedom to operate. Steps 06–08 are designed to be capital-light: pilot work at external facilities and toll manufacturing, with in-house capacity only where strategic economics justify it.
Scale-up Illustrative
From flask to plant, every scale tests the candidate again.
Purity and water content decide what the first measurements mean. Impurities and yield change at kilogram scale. Recovery, solvent losses and energy decide the economics in a pilot and in a plant. LILM’s process layer is designed to carry these consequences back into ranking, and the planned stage gates measure them before a candidate advances.
Process consequences Illustrative schematic
A molecular property becomes a process cost.
In a solvent loop, every property of the ionic liquid shows up somewhere in the plant: selectivity in the column, viscosity in the pumps and mass transfer, thermal stability in the regenerator, losses in the make-up stream. LILM’s process layer is designed to carry those consequences back into ranking.
Extraction loop for an aromatic / aliphatic separation
Illustrative · not an Avestiq processSolvent-loop model Illustrative model
Turn molecular properties into operating numbers.
A one-page model of the loop above, per tonne of solute recovered. Move a property and follow it through the mass balance, the regeneration duty and an operating-cost index. Every input is an assumption or a cited value, every equation is shown, and nothing here describes an Avestiq process or a measured cost.
Inputs
R: solvent recovered per pass. S: tonnes of solvent circulated per tonne of solute. The solute is taken as toluene for h; cp comes from the CO2-screen candidates. The operating index leaves out capital, labor and solvent degradation; the burden index is relative to β = 8, S = 6, 30 mPa s. Measured gas diffusivities in ionic liquids fall more weakly than 1/μ (Morgan, Ferguson & Scovazzo, Ind. Eng. Chem. Res. 2005, 44, 4815–4823, doi:10.1021/ie048825v), so the burden index overstates the viscosity penalty.
Process flow, per tonne of solute
Stream values update with the inputs
Where the regenerator outflow goes
Illustrative modelOperating-cost index
Illustrative modelWhich input moves the index most?
One input at a time over the stated range, all others held at the current settings
Fixed assumptions
Scale-up exposure Illustrative · editorial assessment
Some risks cannot be seen until the scale is large enough.
Where each class of risk becomes measurable and decisive on the path from grams to a commercial plant. This is why a prediction that wins in silico still has to earn its place at each scale.
Risk exposure by scale
Select a cell for the reasoning
Molecule and process IP Planned stage gates
A candidate advances only on measured evidence.
Avestiq-owned candidates are intended to move through explicit gates. Each gate can stop a candidate, and a stopped candidate still returns data to the model.
From design to license
Planned · schematicEvidence Planned
Every experiment becomes evidence, including the failures.
Each planned engagement ends in measurements. Results that public databases rarely hold, such as failed candidates, impurity and water effects, recovery and scale-up behavior, are meant to accumulate in layers that train the next version of the model. Customer-private data stay separate unless an agreement grants training rights.
Defensibility Planned · none of these layers exists yet as an Avestiq asset
Defensibility is planned to come from measured evidence, not from the model alone.
Each layer outward is harder to reproduce. Data rights are to be set by contract: customer-private data are to be kept isolated and to train shared models only where an agreement grants that right.
Model architectures and public data are open to everyone.
Measured outcomes, failures included, are not.
Risk analysis Avestiq’s assessment · October 2026
What could stop Avestiq, and the evidence that would retire each risk.
Fourteen risks across technology, data, commercial, IP and regulatory, team and capital. Each is placed by likelihood and impact, with the planned mitigation and the stage at which evidence should show whether it is working. Switch to “after mitigation” to see where each is targeted to land. Scores are the company’s judgment, not measurements, and the after-mitigation positions are targets.
Planned risk burn-down
Total severity of open risks after each planned stage, if each mitigation works
The full register, as a table
Working with Avestiq
Two planned ways to work with Avestiq: on your problem, or on chemistry Avestiq owns.
Engagement models Avestiq intends to offer. Terms are set case by case.